Over ther past two weeks I have been able to finish a lot of the painting of the sides and bottom of the boat, along with installing the windows. I also reset the way the boat sits on the trailer and added new lights, fixed the wiring, added a new tire, and repacked the wheel bearings. I also reinstalled the keel and hopefully it won't leak. The exterior is nearly complete, with the exception of the top deck. I installed the new lettering and test-fitted the mast and all the rigging to make sure it was in good working order. I also ran both sails up to make sure they worked well. I think it is as ready for the water as it can be for now.

No comments:
Post a Comment